VisibleChanges 30th Conference
Client: VisibleChanges
Producer: Crow Media
Venue: Hilton Americas Houston Hotel
View the streaming video.

Show in progress. The picture was taken from the control position. Thus the speaker clusters did not intrude on the screen from guest view.

Nine HighEnd Systems DL.2's were used to create a variety of looks across three 20'X60' cycs.

Note the stage entrances between the three cycs. The static lights, HES Studio Command 1200's and the HES DL.2's were programmed by LD AJ Freysteinson on the MA Lighting grandMA console.

The center speaker clusters were comprised of six EV-XLC's. More speakers were placed behind the cycs to keep the projection surfaces completely clear of shadows from the audio hang. Audio design and engineering by audio engineer Matt Sterling. Even though the audio design was created to accommodate the lighting design, the client commented that the audio quality was "excellent."

This shows the set prior to DL.2 programming. Besides the main content projection, Freysteinson also had to design and control the runway lighting for video levels. The cycs were custom-built by RoseBrand for this event.

Entertainment segments in the program included a painter, Brazilian dancers and musicians, and acrobats pictures here.

The media server content library allowed the show to flow seamlessly from corporate to "Vegas".

Fashion show portion of the event.

Even though the projection was accomplished by the lighting instruments, the quality of the video was always one of the top priorities. All video show content and switching was in wide screen format. Video engineers included LDS staffers Todd Williams and Markus Taylor.

The Lanier Grand Ballroom takes light very well as seen above. Party Props, Inc. of Houston supplied the chair covers, linens, perimeter decor, and balloon drop.

This shows one continuous image across the 180' projection area.

Testing and set-up phase of the install. We just thought this is a neat picture.
|